VW Touran manuals

Volkswagen Touran Service Manual: Two-Part HS Top Coat

Definition:
Two-Part HS Solid Top Coat -L2K 073 ... ..-
Two-Part HS Mixed Paint -L2K 074 ... ..-
Edition 04/2013
Product Description
The two-part HS top coat series is a high solid top coat system. It is used for vehicle painting.
The color program is extensively coordinated through an assortment of paint mixtures.
Properties:
Easy to process
Dries quickly
Excellent top coat gloss
VOC compliant below 420 g/L
Application Instructions
Base Surface
Suitable base surfaces:
Hardened, solvent-resistant, well-preserved and sanded old paint or factory paints
Surfaces treated with primer or filler
Suitable pre-treatment materials:
Dependent on the object and base surface in accordance with the structure recommendations.
   
Pre-treatment of base surfaces:
  Carefully clean using Silicone Remover -LVM 020 000 A5- or Silicone Remover, Long -LVM 020 100 A5-.
  Two-Part HS Top Coat
  Dry-sand with rotary sander and dust extraction, P400-500 grit.
  Two-Part HS Top Coat
  Or "wet"-sand with P800-1000 sandpaper.
  Two-Part HS Top Coat
  Use a suitable cleaning agent before reworking to ensure a clean and residue-free surface.
  Two-Part HS Top Coat
Processing
Mixture ratio:
  3:1 by volume with:
Two-Part VHS Hardener, Short -LHA 009 050 A2- (for small surfaces, spot repair)
Two-Part VHS Hardener -LHA 009 051 A2-/-LVM 009 051 A5- (for small to medium-sized surfaces, at moderate temperatures)
Two-Part VHS Hardener, Long -LHA 009 052 A2-/-LHA 009 052 A3- (for larger surfaces at moderate temperatures)
Two-Part VHS Hardener, Extra Long -LHA 009 053 A2- (for large surfaces and high temperatures)
See technical application information for the two-part VHS hardener. Refer to → Chapter "Two-Part VHS Hardener and Two-Part VHS Performance Hardener".
  Note
The mixture ratio for Black Matt -L2K 073 3FZ A2- and Gray Matt -L2K 073 7DL A2- is 4:1 with Two-Part VHS Hardener -LHA 009 051 A2-/-LVM 009 051 A5-.
  Two-Part HS Top Coat
Processing time/pot life:
  Ready to spray in 60 to 90 minutes at +20 C (68 F)
Can be thinned using Two-Part Thinner, Special -LVM 009 200 A2-, HS Spot Thinner -LVM 006 000 A2- or Two-Part Thinner, Long -LVM 009 300 A2-.
  Note
When using the HS Spot Thinner -LVM 006 000 A2-, observe the technical application information. Refer to → Chapter "HS Spot Thinner".
  Two-Part HS Top Coat
Application type "coat"
  Two-Part HS Top Coat
  Processing viscosity at +20 C (68 F) material temperature
Processing viscosity "Compliant" and "HVLP":
18-20 Seconds
18 to 25 seconds for Black Matt -L2K 073 3FZ A2- and Gray Matt -L2K 073 7DL A2-
  Two-Part HS Top Coat
  Adding 12.5 % thinner at +20 C (68 F) material temperature
  Two-Part HS Top Coat
  Set spray nozzle (see manufacturer's information): "Compliant" 1.2 to 1.4 mm.
  Set spray nozzle (see manufacturer's information): "HVLP" 1.3 to 1.4 mm.
  Set spray pressure (see manufacturer's information): "Compliant" to 2.0 to 2.5 bar.
  Set atomizing pressure (see manufacturer's information): "HVLP" 0.7 bar.
  Two-Part HS Top Coat
  1.5 spray applications are required to get the recommended dry layer thickness of 50 to 60 mm.
  Note
When using for minimal damage repairs (clever repair procedure), the 12.5% Two-Part Thinner, Special -LVM 009 200 A2- can be replaced with 12.5 % HS Spot Thinner -LVM 006 000 A2-.
Do not apply on slanted surfaces.
During the spray application process, the first half spray application should form a thin, preliminary film upon which a fully-completed spray application can be applied.
For less opaque colors, it may be necessary to apply another spray application after the corresponding ventilation time. Painting over the two-part HS top coat with same is possible to do without "intermediate sanding" when done within 24 hours.
The mixing paint in this mixing paint series can only be used within the color tone formulas. When processing individual mixing paints on their own, major deviations from the information given in the application instructions are possible.
  Two-Part HS Top Coat
Drying
Air dry at +20 C (68 F) room temperature:
Dust dry after 20 to 30 minutes
Ready for assembly after 5 to 6 hours
Dry overnight
  Two-Part HS Top Coat
Final drying time with forced drying is a minimum of 5 to 10 minutes.
  Two-Part HS Top Coat
Forced dry at +60 C (140 F) object temperature for 15 to 20 minutes
  Two-Part HS Top Coat
Final drying time for IR drying is at least 5 minutes.
  Two-Part HS Top Coat
IR drying of bright colors with short-wave radiators for 5 minutes at 50 % power and then for 10 minutes at 100 % power.
IR drying of bright colors with medium-wave radiators for 15 minutes
IR drying of dark colors with medium-wave radiators for 12 minutes
IR drying of dark colors with short-wave radiators for 12 minutes at 50% power
  Note
When using a short-wave radiator at 100% power, bubbles or solvent popping marks could form when reworking dark colors.
  Two-Part HS Top Coat
Special Instructions:
Elastification:
The base material must first be mixed with 15 % Elastic Additive -ALZ 011 001-.
Mixture with two-part VHS hardeners, 3:1 with 15 % thinner
Matting effect/structuring
  Two-Part HS Top Coat
The base material must first be mixed with 100 % Matting Component -ALN 775 106-/Structuring Component, Fine -ALN 775 108-.
  Note
The Black Matt -L2K 073 3FZ A2- and Gray Matt -L2K 073 7DL A2- two-part solid top coats do not require additional Matting Component -ALN 775 106-, since they are already matted.
Mixture ratio for Two-Part VHS Hardener -LHA 009 051 A2-/-LVM 009 051 A5- is 4:1 with 15 % thinner.
Two spray applications (with 5 to 10 minutes intermediate drying time) are needed for an even paint film surface.
  Two-Part HS Top Coat
Personal Protective Equipment:
Note the safety data sheets
Wear the personal protective equipment during application
Characteristics
  Two-Part HS Top Coat
Delivery Viscosity Depends on the color.
Flashpoint: +23 C (73.4 F)
VOC value: 2004/42/IIB(d)(420)420 The EU limit for this product (product category IIB.b) in ready-to-use form is a maximum of 420 g/L volatile organic compounds. The VOC-value of this product in ready-to-use form is a maximum of 420 g/L.
 
     
Storage
The Two-Part HS Solid Top Coat -L2K 073 ... ..- has a guaranteed shelf life of 24 months from date of manufacture.
The guaranteed shelf life of Two-Part HS Mixed Paint -L2K 074 ... ..- is 36 months from the production date. Both products can be used no later than up to the date indicated on the label when stored in original containers at +20 C (68 F).
  Two-Part HS Top Coat
Top Coats
...

Aquaplus System (Solid and Metallic)
Definition: Water-Based Solid Mixed Paint -LWM 075 ...- Water-Based Metallic Mixed Paint -LWM 076 ...- ...

Other materials:

Volkswagen Touran Owners Manual. Technical requirements
First read and observe the introductory information and safety warnings If the vehicle is supplied with a factory-fitted towing bracket it will already have the necessary technical modifications and meet the statutory requirements for towing a trailer. Only use a towing bracket which i ...

Volkswagen Touran Owners Manual. Start/stop system
Fig. 141 In the centre console: button for start/stop system First read and observe the introductory information and safety warnings In the start/stop system, the engine will be switched off automatically when the vehicle is stationary. When required, the engine restarts automatically. ...

© 2016-2024 Copyright www.vwtouran.net | 0.0299